Building & Infrastructure

Crescent and Foul Bay Road Emergency Supply Connection

About the Project

Location: Crescent Road at Foul Bay Road
Stage: Detailed Design
Construction: Anticipated November 2026

This project will upgrade the water infrastructure at the border of Oak Bay and the City of Victoria. The upgrades will help support an emergency water supply for South Oak Bay, on a as-needed basis.

Currently, the only water supply connection is through a CRD main at Lansdowne Road. This connection will help build resilience of our water distribution system by increasing supply locations.

Questions

If you have any questions regarding this project, please reach out to engineering@oakbay.ca

Project Updates

This project is currently going through detailed design, with construction anticipated to begin in November 2026.

Traffic Impacts

More information will become available once designs are finalized and a contract is awarded.