Pipe Work - Beach Drive, Windsor Ave, Newport, Currie Rd

April 29, 2024

Please note that crews will be prepping existing pipe between May 1 and 15 along this route (pictured below):

  • Beach Drive from Bowker Ave to Windsor Ave.
  • Windsor Ave from Beach to Newport
  • Newport from Windsor to Currie
  • Currie Rd from Newport to Transit

Traffic control persons will be on-site directing single lane alternating traffic at points along this route. Please look out for crew and plan for additional travel time.

This preparation work is being done prior to sewer mains being lined at a later date.